Summary of Key Aspects Needing Improvement
Response to Context/Site Plan Design
Panel saw much improvement since the last submission. This was particularly evident with the attempt to recognize the transitional nature of the site by substantially reducing the height of the north tower. The base condition was much improved although one panel member had reservations about the
use of stone.
No comments:
Post a Comment