Wednesday, 22 May 2013

Toronto Future Skyline Rendering With New Towers

Toronto Skyline Rendering with Mirvish Towers and One Yonge Complex

Tower One: 88 floors 271m
Tower Two: 80 floors 247.4m
Tower Three: 75 floors 232.65m
Tower Four: 80 floors 247.4m
Tower Five: 40 floors 179.2m
Tower Six: 70 floors 221.6m
Toronto Star Building: 35 floors 132.67m

Check out the Metrolinx Blog


Toronto Skyscraper Blog Recommends These Sites

Toronto Skyscraper Blog Recommends This Site:

roof repair, roof repairs, roofing repair,roofing repairs, roofing companies, roofing company, roofing companies in Calgary, roofing companies calgary, roofing calgary, calgary roofing , calgary roof contractor, calgary roofer, roofing shingles, roofing contractors calgary, flat roofing, sloped roofing, roof installation calgary, roofing in Calgary, roofing ltd calgary, roofing systems, roofing prices, roofing cost, roofing costs, cost of roof, new roof cost, roof replacement, roof replacement cost, roofing business calgary, best roofing, best roofers, calgary residential roofing, asphalt roofing, calgary shinglers, roofing services, shingles roof, cedar roofing, affordable roofing, roofing estimate, roofing estimates, roof restoration, re-roofing, roof maintenance company in Calgary Alberta



Here is another rendering from the city report on the massive One Yonge Project being proposed by the developer Pinnacle International out of Vancouver. As it looks to win approval from city hall and presents it's plans to the city.  Other buildings in the rendering, include 156 Front Street, Harbour Plaza Condos which are currently Under construction, and the One York Office Tower joint project by Oxford and Menkes.

Toronto Skyscraper Blog Recommends
www.perfumearoma.net




No comments:

Post a Comment