U Condos Slowest construction Ever!!
• project broke ground in November of 2010
• tallest tower will be 55 floors and 184 meters
• Shorter tower is 45 floors and over 500 feet and 155 meters
• proposal was opposed by community groups including the neighboring church
• this project has been very slow to reach ground level
• this property is being developed by the Pemberton Group
• tallest tower will be 55 floors and 184 meters
• Shorter tower is 45 floors and over 500 feet and 155 meters
• proposal was opposed by community groups including the neighboring church
• this project has been very slow to reach ground level
• this property is being developed by the Pemberton Group
Sharing My Thoughts:
Toronto Condo Living has taken off over the last few years, and the
redevelopment in North York Centre, Downtown Toronto, Mississauga and
other areas has been nothing short of mind-blowing. Downtown Toronto and
North York Centre might not be recognizable just due to the speed of
the construction and development. Although there are some that are
opposed to increased condo density, we can't discount the benefits many
with regards to increased higher use of transit, walking biking and
other alternate methods of transport as opposed to using the car.
Toronto just might be a leader, outside of Manhattan (New York City) in
this respect.
No comments:
Post a Comment